The project focuses on identifying, designing, and restoring waterbodies within and around the 25 Industrial Park, considering topography, hydrogeology, and climate factors. It aims to develop an integrated water management plan that ensures long-term water security and resilience up to 2040. CUBE carried out hydrogeological assessments, climate-based water balance studies, and developed site-specific engineering and nature-based restoration strategies. The initiative is designed to enhance groundwater recharge, improve surface water availability, and strengthen climate resilience to support both industrial operations and ecological balance. Through baseline surveys, detailed waterbody mapping, implementation of restoration measures, and the establishment of a monitoring framework, the project adopts innovative practices such as conjunctive use of surface and groundwater, improved water-use efficiency, and enhanced Water Security Status, positioning the park as a model for sustainable industrial water management.